About Us

Since the Chinese Steel Group’s establishment, it has been adhering to the management policy of “survive by quality, develop by-product, cooperate with credit, and win customers with service”, and has gained the reliance of colleagues from all walks of life.

Our main products: Carbon/alloy steel coil/pipe/plate/bar, stainless steel coil/pipe/plate/bar, Galvanized / Galvalume steel coil/pipe/plate, color coated coil/plate, roofing sheet, aluminum coil/pipe/plate/bar, leas sheet, etc.

>> contact us

PRODUCTS LIST ▼

  • Galvalume Steel Coil
  • Galvanized Steel Coil
  • PPGI Steel Coil
  • Stainless Steel Bar
  • Stainless Steel Coil
  • Stainless Steel Pipe
  • Stainless Steel Plate
  • Alloy Steel Coil
  • Alloy Steel Plate
  • Angle Bar Steel
  • C Beam Steel
  • Flat Bar Steel
  • H Beam Steel
  • I Beam Steel
  • Round Bar Steel
  • Aluminum Bar
  • Aluminum Coil
  • Aluminum Foil
  • Aluminum Pipe
  • Aluminum Plate
  • Lead Bar
  • Lead Coil
  • Lead Glass
  • Lead Ingot
  • Lead Plate

Corporate History

August, 1999

the domestication no.2 continuous casting machine was successfully tested

August, 1999

May, 2003

Enter the new century, adopt the most advanced metallurgical technology and control technology, the high starting point of the new 150 tons of stainless steel project, to create a core competitiveness of modern TIsco.
On March 30, 2005, the foundation stone of the 150-ton stainless steel steelmaking project was laid.
In August 2006, after arduous struggle, the carbon steel system of north District steelmaking project was put into operation.
In September 2006, the first stainless steel heat test in north district was successful.
Since then, Tisco has a production capacity of 3 million tons of stainless steel, making it the world’s largest stainless steel producer.
This is another important milestone in the history of the second steelmaking plant.
After the completion of the new steelmaking project, the production area of the second steelmaking plant is divided into the north and south areas, of which the north area is the new steelmaking area.
May, 2003

September, 2007

In September 2007, no. 3 Shuangliu continuous casting machine in the North district was successfully tested.
September, 2007

December, 2013

In December 2013, 180 tons of AOD furnace no. 0 of the Stainless steel transformation project in the North district was completed and put into operation.
December, 2013

September, 2019

Set production processing, sold all over the world.
September, 2019

We would LOVE to work with you!





    Order Details* :

    Please prove you are human by selecting the Flag.